WDW HISTORYPlaces change. Their stories remain.
Menu

Walt Disney World · Disney’s Animal Kingdom Resort Area

Coronado Springs Resort: From the 1997 Convention Hotel to Gran Destino Tower

Coronado Springs’ original village layout, the Pepper Market rename and the 2019 Gran Destino expansion, with historical and current features distinguished.

At a glance

Place
Walt Disney World · Disney’s Animal Kingdom Resort Area
Subject
Resort
Current state
Operating · multiple versions (as of 2026-09-08)
View the source notes
On this page

Disney’s Coronado Springs Resort has two especially visible historical layers: the lakeside convention hotel that opened in 1997 and the Gran Destino Tower expansion of 2019. The tower did not mark the resort’s original opening, nor did it replace the entire older property. Understanding that distinction helps explain why the same resort contains differently named accommodation areas and several generations of dining and arrival spaces. D23’s resort history and Gran Destino Tower entry.

Coronado Springs Resort

Coronado Springs opened on August 1, 1997, as a moderately priced convention hotel with more than 1,900 rooms and suites. Disney organized the guest accommodation around Lago Dorado in three named areas. Casitas drew on colonial Mexican residential architecture, Ranchos on the American Southwest, and Cabanas on a Mexican coastal village. These were distinct settings within one resort, not three separately opened hotels. Disney’s historical reference.

The village arrangement is an important part of the original identity. A map or photograph labeled Casitas, Ranchos or Cabanas is describing that resort geography, while Gran Destino identifies a later addition. The older arrangement also framed a hotel serving convention business as well as vacation accommodation; its meeting facilities were not an incidental restaurant function. D23 identifies Coronado as a convention hotel from its opening, although its present convention-space figures should not automatically be treated as an inventory of the 1997 facilities. D23: Coronado Springs.

Pepper Market and El Mercado

Pepper Market opened as Coronado Springs’ food court on August 1, 1997. In September 2018, the space was redesigned and renamed El Mercado de Coronado. The useful historical distinction is a changed name and presentation within the resort, not the permanent closure of Coronado Springs itself. A recollection of eating at Pepper Market can therefore belong to the same property a later visitor knows by El Mercado, without making the two dining experiences identical. D23: Pepper Market.

Gran Destino Tower

Gran Destino Tower opened on July 9, 2019. Disney’s reference describes a 15-story addition with 545 guest rooms and a new guest-registration area. It brought a more explicitly Spanish arts-and-architecture theme to the resort, with rooftop Toledo dining and the Dahlia Lounge and Chronos Club taking inspiration from characters in the animated film Destino. D23: Gran Destino Tower.

Records from the project team add evidence beyond a visitor-facing description. Lighting designer Illuminating Concepts identifies interior, exterior and landscape lighting among its work, alongside kinetic-feature coordination. Its project account describes the two-story lobby and credits HKS as architect, Allard & Conversano as interior designer, and Balfour Beatty as construction manager. Those credits help separate the many disciplines involved in the expansion instead of attributing every design decision to one person. Illuminating Concepts’ project record.

Structural engineer Brockette Davis Drake independently identifies HKS and Balfour Beatty in its own project record and includes an island bar-and-grill structure in the work’s scope. This helps establish that the expansion was not only a stack of new hotel rooms: it also involved hospitality spaces beyond the tower itself. Engineering project record.

The lake and the continuing resort

Disney’s current description identifies Villa del Lago at the meeting point of three bridges crossing the lake, with Three Bridges Bar & Grill there. It also continues to feature the Dig Site recreation area and its pyramid-themed pool. The tower, lake-crossing connections and established recreation setting are therefore parts of one operating resort, rather than a sequence of hotels that completely erased one another. Current official Coronado Springs overview.

Coronado remains classified by Disney as a Moderate Resort in the Animal Kingdom Resort Area. Its tower and club-access offerings should not be used to silently reclassify the entire property as a different hotel category. For historical comparisons, the clearest labels are the original 1997 resort, the 2018 food-court change and the 2019 tower expansion, followed by whichever dated refurbishment or operating notice is relevant to a later visit. Official classification and current accommodation.

Documented dates

  1. Coronado Springs and Pepper Market opened

    opened · D23; D23
  2. Redesigned Pepper Market became El Mercado de Coronado

    renamed · D23
  3. Gran Destino Tower opened

    opened · D23

Sources & evidence notes

Links in the text lead to the supporting records. Notes below explain what each source establishes; an official retrospective is distinguished from a contemporary announcement or firsthand account.

  1. Coronado Springs Resort — D23. primary reference; accessed 2026-09-08.

    Entire entry: August 1, 1997 opening, original >1,900 rooms/suites, convention identity and three lodging areas. Later convention area metrics/dining inventory are not backdated.

    Return to the article ↑
  2. Pepper Market — D23. primary reference; accessed 2026-09-08.

    Entry text identifies Walt Disney World location, August 1, 1997 opening and September 2018 redesign/rename. Erroneous Disneyland image alt is not relied upon.

    Return to the article ↑
  3. Gran Destino Tower — D23. primary reference; accessed 2026-09-08.

    Entire entry: July 9, 2019, 15 stories/545 rooms, registration, Spanish influence, Toledo and Destino character naming.

    Return to the article ↑
  4. Disney’s Gran Destino Tower — Illuminating Concepts. primary document; accessed 2026-09-08.

    Direct project participant describes lighting scope, two-story lobby and project team. Lake acreage conflicts with D23, so omitted rather than averaged.

    Return to the article ↑
  5. Disney’s Coronado Springs Resort Gran Destino Tower — Brockette Davis Drake. primary document; accessed 2026-09-08.

    Direct structural engineering project record identifies HKS, Balfour Beatty and island bar-and-grill scope.

    Return to the article ↑
  6. Disney’s Coronado Springs Resort — Walt Disney World. primary reference; accessed 2026-09-08.

    Current booking overview inspected: operating Moderate Resort, Animal Kingdom Resort Area, Villa del Lago bridges/Three Bridges, Dig Site and tower/club offerings.

    Return to the article ↑

About this entry

Published · Updated . Evidence review: .

Written and source-checked with AI assistance, including a separate automated review. This is not a claim of firsthand experience or professional human fact-checking. Corrections policy & change log.

  • Resort-wide / Resort

    Disney's All-Star Music and All-Star Movies Resorts

    Opening dates, phased construction and architectural history of Disney's All-Star Music and All-Star Movies Resorts, with their different themed sections.

    Operating · multiple versions
  • Resort-wide / Resort

    Disney's Contemporary Resort

    The Contemporary opened in 1971 with prefabricated rooms and a monorail through its tower. Explore its design history and the myth about removable rooms.

    Operating · multiple versions
  • Resort-wide / Resort

    Disney's Asian Resort

    Trace Disney's Asian Resort from the 1969 plans to a proposed 1974 opening, and distinguish its Thai-inspired design from the later Grand Floridian.

    Planned, never built
  • Resort-wide / Resort

    Disney’s Animal Kingdom Lodge and Kidani Village

    How Animal Kingdom Lodge grew from its 2001 hotel into Jambo House and Kidani Village, with the DVC phases and room-count distinctions explained.

    Operating · multiple versions